Doray v. 9498-5215 Québec inc. (Construction Kaglis)

Executive Summary: Key Legal and Evidentiary Issues

  • Under articles 2803 and 2804 C.C.Q., the plaintiff had to prove his $15,000 claim on a preponderance of evidence, and he itemized that claim only at trial.
     
  • Little weight was given to the Delta-Spec inspection report, because its author did not testify and its uncaptioned photographs could not be linked to the deficiencies it described.
     
  • Construction Kaglis admitted the roof slope, unfinished flashing, patio door framing cracks, missing caulking, unlevel door panels and a missing moulding section, and these admissions supported the findings of defective work.
     
  • No proof showed that the wrong patio door was installed, so the $5,840 reimbursement claim failed.
     
  • Claims about the kitchen beams and the painting failed on inconclusive photographic evidence, while the burnt beam and rooftop terrace claims rested on testimony alone.
     
  • Damages were hard to assess because the inspection report contained no repair cost estimates, and the court refused to apply the contractor’s internal $71.90 hourly carpenter rate to an individual hiring outside help.
     


Facts of the case

After a fire at his three-unit residential building, Jean-François Doray obtained a quote from his insurer, Desjardins. The quote, dated May 6, 2024, detailed all the required work at $175,323.06. He hired 9498-5215 Québec inc., doing business as Construction Kaglis, to restore the building, and gave the company a copy of the quote so it could prepare the contract. That contract, signed September 24, 2024, was for $193,000.

Unhappy with the quality of the work, Mr. Doray sued Construction Kaglis for $15,000 in the Small Claims Division of the Court of Québec. He presented his breakdown only at trial. It covered:

  • roof membrane, levelling and parapet work ($2,000)
  • replacement of the patio door in unit 2022 ($5,840)
  • repair of the kitchen beams in that unit ($2,500)
  • partial floor replacement ($2,000)
  • painting ($860)
  • moulding finishing ($500)
  • the rooftop terrace and a fire-damaged beam ($1,300)

Construction Kaglis answered that Mr. Doray had stopped paying and had refused it access to the building to finish the job. In the alternative, it argued that the claim was exaggerated. The decision does not separately rule on the non-payment and access defence.

Policy and legislative provisions at issue

For the roof, the insurer’s quote called for “partial repair of the existing structure” and “replacement of half of the rear section.” The contract itself did not specify the roof work required, but it reproduced the dimensions from the quote. On the patio door, the contract provided only for “Replacement of the exterior rear balcony patio door on the 2022 and 2024,” with no further specification.

Under articles 2803 and 2804 of the Civil Code of Québec, Mr. Doray had to prove his claim on a preponderance of evidence. Article 1458 C.C.Q. requires every person to honour their contractual commitments and makes them liable for material injury caused by a breach. Articles 2098 and 2100 C.C.Q. govern contracts of enterprise. They oblige a contractor to act in the client’s best interests with prudence and diligence, to follow usual practice and the rules of the art, and to ensure the work conforms to the contract. Interest and the additional indemnity were addressed under articles 1618 and 1619 C.C.Q. The court cited article 231 of the Code of Civil Procedure in deciding whether the inspection report’s cost could be recovered as legal costs.

Reasoning and analysis

The court examined each item in turn. Mr. Doray’s main evidence was a report from Delta-Spec Services d’inspection dated May 28, 2025, but its author did not testify. That report wrongly described a “complete reconstruction of the roof,” did not tie its findings to specific photographs, and attached photos with no captions. Without the inspector’s explanation, the court found the report of little use apart from one photograph of a lifted section of roof membrane.

On the roof, Construction Kaglis admitted that the roof was not fully level and that the flashing, which Mr. Doray called the parapet, was incomplete. Its own video and photographs showed standing water, confirming an inadequate slope. Mr. Doray therefore proved that the membrane installation and the slope were deficient and that the flashing was unfinished.

The patio door claim failed. An Auroral quotation referred to a door at $5,840.19 less a 35% discount, stated as $3,796.19. An Auroral invoice dated January 1, 1900 (noted “sic” in the decision) listed no item prices, did not refer to the quotation and showed a different total. The door drawings on both documents were identical but generic, and Mr. Doray offered no photo of the door he expected. An Auroral representative testified that he installed new door panels free of charge in December 2025, after the inspection, and that the door was undamaged. Construction Kaglis nonetheless admitted to a crack at a corner of the flashing and the patio door framing, missing caulking, and panels that were not fully level.

Photos and videos from both sides revealed no problem with the kitchen ceiling beams. For the floor, Mr. Doray’s photos showed nails on unprotected sections but no damage, and he offered no evidence about the floor near the sink. A Construction Kaglis video, however, showed three boards with small nail-head-sized notches and another with large scuffs. The court accepted this as damage done during the work.

The painting claim failed because all walls and ceilings were white, so the photos could not show whether primer or paint had been applied. Painter’s tape proved nothing either way, since it is used for both. The court also could not read the label in a photo that allegedly showed gallons of paint.

Construction Kaglis admitted a section of moulding was missing. Claims about the fire-damaged support beam and the rooftop terrace rested on Mr. Doray’s testimony alone, which the court held insufficient.

Assessing damages was difficult because the inspection report contained no repair cost estimates. A Construction Kaglis representative testified that a carpenter at $71.90 an hour could correct the roof slope in four hours, with one more day for the remaining roof work. The court accepted that the company pays its carpenters that rate but reasoned that an individual hiring a carpenter would not get it. Relying on the admitted repair time, it granted the full $2,000 claimed for the roof.

No cost evidence was led for the flashing and door framing cracks, the caulking, the panel levelling or the damaged floorboards. For the moulding, the representative pointed to the quote’s price of $3.33 per linear foot and said a carpenter could finish in under an hour. The court applied the same reasoning about hiring rates and noted that assessing damages is not an exact science, citing Robinson c. Barbe, 2000 CanLII 11355 (QC CA). It set the loss for these remaining defects at $1,500 at its discretion.

Neither the March 28, 2025 formal notice letter nor the originating application itemized the claim, so interest was ordered to run only from the date of judgment. The cost of the inspection report was refused as legal costs because the report did not help the court assess the evidence.

Ruling and overall outcome

On October 9, 2026, the court partially granted Mr. Doray’s claim against 9498-5215 Québec inc. The company was ordered to pay him $3,500, with interest at the legal rate and the additional indemnity under article 1619 C.C.Q. running from the date of judgment. It was also ordered to pay $237 in legal costs. His claims for the patio door replacement, kitchen beams, painting, the burnt beam and the rooftop terrace were not proven.

Jean-François Doray
Law Firm / Organization
Not specified
9498-5215 Québec inc. faisant affaire sous Construction Kaglis
Law Firm / Organization
Not specified
Court of Quebec
500-32-727600-258
Construction law
Not specified/Unspecified
Plaintiff