• CASES

    Search by

Capilano Suspension Bridge Holdings Ltd. v The District of Tofino

Executive Summary: Key Legal and Evidentiary Issues

  • Capilano Suspension Bridge Holdings Ltd. sought judicial review of the District of Tofino’s refusal to connect its proposed resort development to the municipal water system.
     
  • Reasonableness was the agreed standard of review, and the court assessed both the original Refusal Decision and the later Reconsideration Decision.
     
  • Section 4.5 of the 2015 Water Utility Bylaw, and its successor s 4(5) of the 2024 bylaw, gave the Director of Infrastructure and Public Works authority to limit the size and capacity of water connections to protect the system and other users.
     
  • Reliance on the maximum daily demand deficit, together with the projected reduction of the average daily demand surplus, was found reasonable for a flow-through water system with minimal raw water storage.
     
  • An email marked “without prejudice” was held not to be protected by settlement privilege because it was not an attempt to settle the litigation.
     
  • CSB’s application to reopen its case after the District repealed its Limits to Growth Policy and amended its Official Community Plan failed because no miscarriage of justice was likely and the new evidence would probably not have changed the result.
     


Facts of the case

Capilano Suspension Bridge Holdings Ltd. (CSB) owns a 4.05-hectare property at 600 Hellesen Drive in Tofino, British Columbia, zoned for commercial tourist use and related accommodation. In May 2023, the District of Tofino issued a development permit authorizing 47 oceanfront suites, eight guest cabins, 70 sleeping units for employee housing, and buildings for a resort restaurant. CSB applied for building permits in December 2023 for the Tofino Beach Lodge suites, reception, restaurant and lounge, a spa, and a 10-unit employee housing building. In mid-2025, CSB dropped the spa from its plans.

Tofino’s water system draws from five creeks on Meares Island and operates as a flow-through system without significant raw water storage. Shortages in 2006 led to a local state of emergency and the closure of all tourism businesses, and the strictest water restrictions were narrowly avoided in 2023. The District’s Water Master Plan, dated February 16, 2024, identified a deficiency in raw water supply during the dry season.

On March 21, 2024, Aaron Rodgers, the District’s Director of Infrastructure and Public Works, refused a water connection for the development. He calculated a peak hour demand of 5.9 l/s, which he said would account for 23.6% of the observed baseline creek low flow and may cause adverse effects on other users during periods of high demand and low source water flows. CSB’s engineers later submitted lower demand figures. In November 2024, Building Inspector Nicholas Henderson told CSB’s counsel he had not refused the building permits but had paused processing them because no works and services agreement was in place and no alternative water supply had been approved. The District Council adopted a Limits to Growth Policy (LGP) on December 10, 2024, which made commercial accommodation uses ineligible for a water allocation certificate unless the applicant could provide alternate raw water capacity or other solutions to the Director’s satisfaction.

CSB filed its petition on February 13, 2025. A May 2025 technical memo from the District’s engineering consultant, McElhanney Ltd., put the revised development’s demand at 101 m³/day of maximum daily demand (MDD), or 50 m³/day of average daily demand (ADD). On July 4, 2025, Director Rodgers issued a Reconsideration Decision, again refusing the connection because it would raise the existing MDD deficit from 713 m³ to 814 m³, an increase of approximately 14%.

Policy and legislative provisions at issue

Section 4.5 of the District’s 2015 Water Utility Bylaw allowed the Manager, for the purposes of protecting the water system and preventing adverse effects on other users, to “limit the number, size, and capacity of connections” and to “refuse water Service main extension or Service enlargement.” The 2024 Water Utility Bylaw, which replaced it on June 25, 2024, contains similar language in s 4(5). Under s 10.1(f) of the District’s 2019 Building Bylaw, where a parcel cannot be connected to the District’s waterworks system, the owner must obtain approval for an alternate water supply system before a building permit issues.

The court also set out the works and services provisions in Part 14 of the Local Government Act (ss 506, 506.02, 506.03 and 509) and ss 8 and 54 of the Community Charter, which CSB’s counsel had invoked in demand letters to the Inspector. Under s 54, a building inspector must give written reasons for refusing a building permit if the applicant requests them.

Reasoning and analysis

Applying the reasonableness standard from Canada (Minister of Citizenship and Immigration) v Vavilov, 2019 SCC 65, the court first rejected the District’s position that only the Reconsideration Decision should be reviewed. Although the parties agreed the Refusal Decision rested on incorrect water demand calculations, the court held that both decisions should be considered to the extent they shared the same factual constraints.

On the availability of water, the court found that both decisions dealt with the issue in the context of adverse impacts on other users and the risk of restrictions. Requiring CSB to install an upgraded 250 mm watermain while refusing the connection was not contradictory, since the requirement anticipated CSB finding an alternative water supply. New connections approved since CSB applied added only 2.85 m³/day of ADD in aggregate, compared with the 50 m³/day CSB’s project would require, so the Director was not obliged to address them.

The court declined to consider the District’s July 2024 water policy report and the LGP when assessing the Refusal Decision, as neither existed in March 2024, and found no evidence the Director relied on the LGP in either decision. CSB’s argument that the Director ignored the ADD surplus also failed. The Director expressly acknowledged the surplus but explained that it existed in 2023 when severe restrictions were narrowly avoided, and he relied on the Water Master Plan’s statement that creek flows in a flow-through system should be able to meet MDD.

CSB argued the bylaws permitted refusal of service only for cross-connection risks. The court disagreed, holding that the bylaw language gave the Director authority to limit the size and capacity of the connection CSB sought. His decision did not rule out a smaller connection or an alternative water source.

The court accepted that the Director and Inspector likely knew, when cross-examined in August 2025, that council would allocate 33.12 m³/day of water to a residential development at 825 Campbell Street the next day, and that they did not disclose this. It found, however, that the District had no obligation to disclose prospective connections during litigation, particularly where CSB had not identified an alternative water source despite being told of that requirement as early as March 2024. The court also rejected the claim that the refusal was based simply on the project being a resort.

After the January 2026 hearing, CSB applied to reopen its case to admit evidence that the District Council repealed the LGP on February 24, 2026, and amended its Official Community Plan, a process that began with a first reading on December 9, 2025. The District opposed reopening but asked that, if it were allowed, an affidavit from Director Rodgers also be admitted. That affidavit attached a March 4, 2026 email from CSB’s architect, marked “without prejudice,” asking to discuss alternative water sources. The court held the email was not privileged, as its purpose was to continue discussions about the project rather than to settle the litigation. While the court accepted the new material was fresh evidence and that reopening would not prejudice the District, it found no likely miscarriage of justice and no likelihood the evidence would have changed the result. According to the court, the officials’ nondisclosure at their examinations, the adoption and repeal of the LGP, and the OCP amendment “may be disingenuous” in light of CSB’s efforts to obtain its permits. Any such concern, it found, was tempered by the deference owed to municipal planning decisions and the District’s efforts to work with CSB on the project.

Ruling and overall outcome

The Supreme Court of British Columbia found both the Refusal Decision and the Reconsideration Decision reasonable and dismissed CSB’s amended petition along with its application to reopen. The District of Tofino and Building Inspector Henderson prevailed, with the District awarded its costs at Scale B for both the petition and the application. No dollar amount for those costs was stated in the decision.

The District of Tofino
Nicholas Henderson, Building Inspector
Capilano Suspension Bridge Holdings Ltd.
Law Firm / Organization
Cox Taylor
Lawyer(s)

L. John Alexander

Supreme Court of British Columbia
S101373
Administrative law
Not specified/Unspecified
Respondent