9439-0473 Québec inc. v. Constructions Gilles Gravel inc.

Executive Summary: Key Legal and Evidentiary Issues

  • The buyer’s failure to obtain a pre-purchase inspection, despite its competence in the field and a seller’s declaration disclosing a marsh and flood zone, meant it had not acted as a prudent and diligent buyer.
     
  • A low sale price was treated as a factor that should have prompted greater caution before purchase.
     
  • Notice of the defects to the seller, the previous owner and the contractor was found to have been given within a reasonable time.
     
  • Claims against the contractor and its excavation subcontractor were time-barred because the previous owner had reported water infiltration to the contractor before 2021.
     
  • Expert evidence placed the basement slab at 102.13 metres against a permit requirement of 102 metres and attributed the infiltration to another cause.
     
  • Late-filed exhibits from both sides were admitted to avoid a postponement and help establish the truth.
     


Facts of the case

In 2021, 9439-0473 Québec inc. bought a building at 69 chemin du Domaine Lévesque in Roberval from 9283-7434 Québec inc. under a notarial deed of sale dated December 8, 2021. The sale carried the legal warranty of quality, and no pre-purchase inspection was done. After a water damage incident on April 15, 2022, the buyer alleged that the contractor, Les Constructions Gilles Gravel inc., had built the house lower than the height shown on the building permit. It also alleged that the foundation and slab did not meet municipal requirements or good construction practice, and that no drainage outlet was connected to the French drain. As emergency work, it replaced the sump pump at a cost of $183.48.

Notice of the defects went to the seller around April 19, 2022, to the contractor on June 6, 2022, and to the previous owner, Sylvie Thériault, on June 14, 2022. A formal demand was also sent to the contractor on June 6, 2022. On April 14, 2025, the buyer filed a small claims action against the seller and the contractor for $14,816.52. The claim covered plumbing and land surveyor invoices, the cost of corrective work not yet carried out, and damages for trouble, annoyance and inconvenience.

Each defendant resisted the claim. The seller argued that the buyer skipped a pre-purchase inspection despite its knowledge of the field and the seller’s declaration, and that any defect was apparent and minor, limited to the pump. According to the contractor, the basement slab sat at 102.13 metres, above the 102 metres required by the city’s building permit. It also argued the claim was prescribed because Ms. Thériault had complained of infiltration before 2021. The contractor called in warranty the excavation company, 9487-1498 Québec inc. That company replied that it no longer existed, that Robert Jr Meunier had done the work on an hourly basis, and that the contractor had supervised the work and made all technical decisions. Two days before trial, the contractor asked to file eight additional exhibits, and on the day of trial the plaintiff asked to file two more. The court admitted them to avoid a postponement and to get at the truth.

Policy and legislative provisions at issue

The claim against the seller rested on the legal warranty of quality. Under article 1726 of the Civil Code of Québec, a seller must warrant that the property is free of latent defects. Article 1732 allows the parties to exclude that warranty by agreement, which they had not done here. For the action against the seller, the court applied a three-year prescription period. It also considered the building permit, which called for an elevation of 102 metres, and the seller’s declaration, which disclosed that the property was located in a marsh and a flood zone. Supporting authorities included Italia c. Robitaille, 2012 QCCA 180, on a low sale price as a signal for caution. The court also relied on a treatise by J. Edwards on the seller’s warranty of quality for the principle that dilapidation is not a latent defect.

Reasoning and analysis

On the first issue, the court found that the buyer had not been prudent and diligent before the sale. A low sale price should have prompted caution, and in some circumstances a prudent buyer must have an independent expert inspect the property. That obligation weighed more heavily here because the buyer was competent in the field. The court based this on an RBQ licence-holder register extract and a business card filed in evidence, even though it was the buyer’s brother who served as technical respondent. Faced with a seller’s declaration disclosing a marsh and flood zone, a buyer with that expertise should have had a competent third party look further into the matter.

Notice was found adequate on the second issue, since the defects had been reported to the seller, the previous owner and the contractor in 2022 and the corrective work had not yet been done. Timeliness produced a split result. The action against the seller, filed on April 14, 2025, came just inside three years after the April 2022 water damage. For the contractor and its excavation subcontractor, however, the period had expired, because Ms. Thériault had reported the infiltration problem to the contractor before 2021.

The final issue also went against the buyer. Joël Duchesne of the Ville de Roberval’s urban planning department indicated that the elevation of construction near Lac-Saint-Jean is not set by regulation in that sector, despite what the permit suggested. In any event, the contractor’s expert report found the basement slab compliant at 102.13 metres against the permit’s 102 metres and attributed the infiltration to a cause other than the elevation. Engineer Louis-Marie Gauthier confirmed that the construction was compliant and that the building’s weight rests entirely on its piles. A separate inspection found that the drain runs around the perimeter of the house and is in good condition.

Ruling and overall outcome

The Court of Québec, Small Claims Division, dismissed the claim of 9439-0473 Québec inc. against Les Constructions Gilles Gravel inc., 9283-7434 Québec inc. and 9487-1498 Québec inc. in its judgment of October 16, 2026. All three defendants prevailed, and the buyer recovered nothing on its $14,816.52 claim. Instead, it was ordered to pay legal costs of $374 to each defendant, with no combined total stated in the decision.

9439-0473 Québec Inc.
Law Firm / Organization
Not specified
Les Constructions Gilles Gravel Inc.
Law Firm / Organization
Not specified
9283-7434 Québec Inc.
Law Firm / Organization
Not specified
9487-1498 Québec Inc.
Law Firm / Organization
Not specified
Court of Quebec
155-32-700477-255
Real estate
Not specified/Unspecified
Defendant