• CASES

    Search by

Groupe CRH Canada inc. v. Ville de Laval

Executive Summary: Key Legal and Evidentiary Issues

  • The court first had to decide whether a quarry qualifies as a mine and a mining operation under section 65 of Quebec’s Act respecting municipal taxation.
     
  • Correctness governed that interpretive question, while the two remaining issues were treated as mixed questions reviewable only for palpable and overriding error.
     
  • Access roads to a mining operation are excluded from the assessment roll under section 65 para. 1(8), but internal circulation roads on the site fall outside that exclusion.
     
  • Gravel roads and work areas built from quarry material were found to have lost their character as raw material and become works serving the quarry’s use.
     
  • Concrete roads were held not to be primarily pollution-control apparatus under section 65 para. 1(1.1), even if they help limit dust.
     
  • Because the TAQ never analyzed the evidence separating access roads from internal roads, that determination was sent back to it.
     


Facts of the case

Groupe CRH Canada inc. (CRH) owns three quarries in Laval, Quebec, and disputed with Ville de Laval over whether certain features of those properties should be entered on the municipal assessment roll. In a 2023 decision, the Tribunal administratif du Québec (TAQ) agreed with the City that a quarry is not a mine. The part of that decision challenged on appeal concerned gravel roads and work areas, as well as concrete roads, on the three sites. CRH obtained leave to appeal to the Court of Québec’s Administrative and Appeal Division on April 17, 2024, on three questions, and a judicial review application against the leave judgment was dismissed in 2025. The appeal, brought under section 159 of the Act respecting administrative justice, was heard on June 4, 2026, and decided on November 2, 2026.

Policy and legislative provisions at issue

Section 65 of the Act respecting municipal taxation lists immovables that are not entered on the assessment roll. CRH relied on paragraph 1(8), which excludes an access road to a forest or mining operation. For gravel areas, it invoked paragraph 1(5), covering a reserve of raw material in a peat bog, quarry or sand pit. Its argument on the concrete roads rested on paragraph 1(1.1), which excludes machines, apparatus and their accessories used or intended for fighting pollution that may result from industrial production, within the meaning of the Environment Quality Act, or for controlling such pollution. The TAQ’s reasoning also drew on paragraph 1(3), excluding a mineral substance in natural deposits that can reasonably be expected to yield products sold at a profit, and paragraph 1(4), covering a gallery, shaft, excavation, tunnel or the equipment of an underground or open-pit mine. Finally, the second paragraph of section 65, at subparagraph 3, provides that paragraphs 1(1) and 1(1.1) do not cover land, land development works, or any other immovable whose main use or purpose is to ensure the usefulness of that land or work.

Reasoning and analysis

On the first question, the parties agreed that correctness applied. In rejecting CRH’s access-road argument, the TAQ had relied on the text of section 65, reasoning that if a quarry were a mine, paragraphs 1(3) and 1(5) would duplicate each other, and that paragraphs 1(4) and 1(5) separately name mines and quarries. Although the court found the argument not without interest, it disagreed with it. Section 65 uses “mine” in paragraph 1(4) and “mining operation” in paragraph 1(8), and relying on Bloom Lake General Partner Limited v. Ville de Fermont, the court explained that a mining operation covers all mining activities while a mine is the place where ore is extracted. These terms, along with “industrial production” and “quarry,” describe nested realities. In the court’s view, paragraph 1(3) targets a resource still underground that must be extracted and processed, such as gold or diamonds, whereas in a quarry the aggregate itself is the resource. Stockpiled gravel or sand in a quarry, by contrast, has intrinsic value without further processing, which is what paragraph 1(5) addresses and which explains why the two provisions coexist. Its reading, the court added, also aligned with the Court of Appeal’s decision in Demix v. Montréal, which described the case before it as involving the excavation of an open-pit mine and a reserve of raw material of a quarry. It concluded that the TAQ had erred in law in characterizing CRH’s quarries, so paragraph 1(8) applies to all access roads, whether gravel, concrete, asphalt or otherwise.

That exclusion, however, reaches only access roads. Following Bloom Lake, where only the road linking the public road to the mine’s gatehouse was excluded, internal circulation roads fall outside paragraph 1(8). According to the court, evidence distinguishing the two types of roads was apparently presented to the TAQ, but the TAQ did not analyze it because it had rejected the exclusion outright, and the court lacked that evidence to make the determination itself.

The second question was treated as a mixed question, contrary to CRH’s position. CRH appeared to have abandoned its earlier arguments that the gravel roads and areas were temporary or were production accessories, and an argument barely raised at the hearing that they were equipment under paragraph 1(4) was not considered because it had never been pleaded before. What remained was the claim that gravel spread as roads is still raw material under paragraph 1(5), regardless of its form. Although the TAQ had not addressed that provision directly, it had examined the evidence and found that the gravel roads and areas required considerable preliminary work, met precise slope and load-capacity specifications, and had become permanent. Seeing no palpable and overriding error in those findings, the court held that the material had lost its individuality and become part of a work serving the quarry’s use within the meaning of section 65 para. 2(3). Raw material converted into such a development must be entered on the roll.

On the third question, the court noted that any concrete roads qualifying as access roads would already be excluded under paragraph 1(8). For the rest, the TAQ had rejected CRH’s pollution-control argument, finding that a concrete road is neither a machine, an apparatus nor an anti-pollution device, based on definitions from the Supreme Court of Canada in Saint-Basile, Village Sud v. Ciment Québec that no party disputed. The court declined to interfere, finding that roads and areas on the quarry sites, concrete or not, may help reduce dust but are primarily developments that allow the properties to be used as quarries.

Ruling and overall outcome

The court allowed the appeal in part, solely to declare that a quarry qualifies as both a mine and a mining operation under section 65. It returned the file to the TAQ to determine which roads on CRH’s properties are access roads, and declared that those roads must be excluded from the assessment roll under paragraph 1(8). CRH’s remaining grounds were dismissed, leaving the City successful on the gravel areas and concrete roads. Given this divided result, each party was ordered to bear its own costs, and no monetary amount was awarded.

Groupe CRH Canada Inc.
Law Firm / Organization
David | Sauvé LLP
Lawyer(s)

Eric David

Ville de Laval
Law Firm / Organization
LESAJ, Avocats et notaires
Tribunal administratif du Québec
Law Firm / Organization
Not specified
Court of Quebec
540-80-008613-231
Administrative law
Not specified/Unspecified
Other