Executive Summary: Key Legal and Evidentiary Issues

  • Whether the receiver could end the remaining residential leases at Stadium Plaza, either by disclaimer or by a declaration of frustration, was the central question.
     
  • A heating system disabled by ongoing theft of copper piping, with repairs estimated at approximately $461,000 and three to four months of work, was the key factual issue.
     
  • The court found that no reasonable tenant would stay in an unheated Edmonton apartment building from mid-November to mid-February at minimum, satisfying s. 40(1)(b)(ii) of the Residential Tenancies Act.
     
  • Alberta’s minimum housing standards, which require heating capable of maintaining at least 22°C, were breached in a way that could not be remedied immediately, which also met s. 40(1)(d).
     
  • Under the Frustrated Contracts Act, tenants are entitled to refunds of rent prepaid for periods after the judgment and to the return of damage deposits, subject to reasonable holdbacks.
     
  • Occupiers whose leases had expired or who never had a lease fall outside the frustration finding, leaving the receiver to its ordinary recovery-of-possession remedies under the Residential Tenancies Act.
     


Facts of the case

Stadium Plaza is a six-storey, 78-unit apartment building in central-east Edmonton, completed in 2024. Its construction was troubled, and various construction liens were registered against it. Since then, the building has suffered from less-than-full occupancy, unauthorized occupants in unleased suites, illegal drug activity, a flood that disabled the elevators, ongoing damage to the main and suite entrances, gang-related graffiti, excessive noise day and night, effectively daily police attendance and, eventually, the loss of heat after ongoing thefts of copper piping throughout the building.

After payment defaults in early January 2026, the first mortgagee began enforcement proceedings. Grant Thornton Ltd was appointed receiver on August 25, 2026, and had since collected only approximately $13,000 of an estimated $90,000 in rent owing. A Residential Inspection Safety Compliance (RISC) Team, made up of representatives from the Edmonton Police Service, Edmonton Fire Service, City of Edmonton, Alberta Health Services, Bissell Centre and Hope Mission, inspected the building three times over several weeks, including on November 10. According to the receiver’s counsel, the team’s consensus supported vacating the building, although no formal report or recommendation had been issued. As far as the receiver was aware, no uninhabitability declaration had been made under s. 62 of the Public Health Act.

The receiver’s First Report, dated November 3, 2026, stated that copper piping had been removed mainly from the fifth and sixth floors and at various points on the lower four, leaving the entire boiler heating system non-functional. A preliminary repair estimate came to approximately $461,000, with work expected to take three to four months. Citing recurring unauthorized access, ongoing vandalism and the risk of further damage to a repaired system, the receiver considered it unreasonable to carry out repairs while the building remained occupied, and none of the alternative heating options it explored proved viable. On October 28, 2026, the receiver notified tenants of the lack of heat, falling temperatures and resulting health and safety concerns, and encouraged them to find other accommodation. Of the 78 units, 42 were vacant, 22 were occupied by persons whose leases had expired, 2 by persons who never had a lease, and 12 by tenants holding valid, ongoing leases, though the court’s later analysis refers to 13 units occupied by valid-lease tenants.

The receiver applied, on notice to all affected persons, for approval to disclaim all remaining leases or, alternatively, for a declaration that the leases had been frustrated. Only one tenant, Ms. Olesen, attended. She confirmed the inoperable elevators and lack of heat, said she had been coping partly with space heaters and by boiling water, and asked to move out by November 23 rather than the receiver’s proposed date of November 20.

Policy and legislative provisions at issue

Section 40(1) of the Residential Tenancies Act provides that a residential tenancy agreement is frustrated in several circumstances. These include where the premises, common areas or property are damaged to the point that a reasonable tenant would not be willing to remain (s. 40(1)(b)(ii)), and where a s. 62 Public Health Act order closes the premises, declares them unfit for habitation or otherwise makes continuing the tenancy practically impossible (s. 40(1)(c)). Frustration also occurs where the premises are in a condition that contravenes a health and safety enactment governing housing and the condition is not remedied in accordance with that enactment (s. 40(1)(d)). Under s. 40(2), the law of frustration of contracts then applies.

The Housing Regulation (Alta Reg 173/1999) under the Public Health Act requires owners to supply adequate heating facilities capable of maintaining a habitable indoor temperature where premises are used or intended for use during all or part of the period from September 1 to May 1. Owners must also keep those facilities free from defects and in proper operating condition, and must comply with the Minimum Housing and Health Standards. Those standards require heating facilities able to keep habitable rooms, bathrooms and toilet rooms at a minimum of 22°C (71°F), and they prohibit cooking appliances and portable space heaters from serving as the primary heat source. Owners must also ensure a continuous supply of heat unless the rental agreement makes the occupant solely responsible for it. Section 62 of the Public Health Act allows an executive officer to issue orders that may require a place to be vacated, declare it unfit for human habitation, close it, or require specified work.

The Frustrated Contracts Act also applied. Section 3 makes sums paid before discharge recoverable and provides that sums payable cease to be payable. Sections 4 and 5 give the court discretion to allow recovery or retention for expenses incurred and benefits conferred before discharge.

Reasoning and analysis

On s. 40(1)(b)(ii), the court weighed several factors: the absence of heat, no realistic prospect of repairs before mid-February at the earliest, and no evidence of feasible temporary heating compatible with continued occupancy. It also relied on the Environment Canada forecast for November 13 to 19, which predicted daily highs falling from 8°C to -1°C and lows from 0°C to -7°C. Other factors were the small number of units held under valid leases, the attendance of only one such tenant, who was herself leaving, and the lack of evidence that anyone had moved in after the heating failed. The court interpreted a “reasonable tenant” as someone in legitimate occupation who pays, and is willing to keep paying, rent in full. On that standard, it held that no reasonable tenant would remain in an unheated Edmonton building from mid-November to mid-February at minimum.

Turning to s. 40(1)(d), the court found that an unheated building plainly fails the minimum heating requirements. Neither the Housing Regulation nor the standards set remediation expectations or deadlines, but the court noted that s. 62 of the Public Health Act might fill that gap. It inferred that any applicable remediation requirement would call for immediate, emergency restoration of heat given the time of year. Given the extent of the work needed, the court further inferred that such a requirement would not be met. This amounted to a material breach of a critical heating requirement that could not be remedied immediately. Under either branch, conditions were incompatible with continued occupancy by any tenants, and the tenancy agreements had been frustrated.

On the consequences, the court held that under ss. 3 or 5 (or both) of the Frustrated Contracts Act, the landlord or receiver, as applicable, must refund rent prepaid for any period after the date of the judgment. Damage deposits, plus any required interest, must also be returned, subject to reasonable holdbacks for unit damage as permitted under the leases. Receiver’s counsel advised that the receiver will, or at least may, agree to refund prepaid “unearned” rent. As far as the receiver was aware, it had received no damage deposits or information about them from the owner, and it had apparently received no requests for rent abatement. Recovering unpaid rent from non-paying tenants was not raised. The court said it would give directions for hearing any disputes over deposits, prepaid rent or rent abatement. It also clarified that frustration does not apply to expired or non-existent leases, so the receiver remained free to use the recovery-of-possession steps already available to it under the Residential Tenancies Act for those occupiers.

In closing remarks, the court noted the continued absence of a s. 62 order. It questioned how a building without heat, and apparently not repairable until mid-February, could be regarded as fit for habitation in Edmonton. Had such an order been issued, frustration under s. 40(1)(c) would have been easily recognized.

Ruling and overall outcome

The receiver obtained the relief it sought in large part. The court declared the remaining residential tenancy agreements frustrated, making it unnecessary to address the proposed disclaimer. It directed tenants with existing leases to vacate with all belongings by 12 noon on November 20, 2026. Tenants unable to meet that deadline could request an extension, giving a proposed date and brief reasons, by letter, note or email to the receiver by 5 pm on Monday, November 16. Ms. Olesen’s request to stay until November 23, 2026 was granted. Anyone remaining after the applicable deadline is subject to removal under paragraph 5 of the receiver’s first draft order. The court also approved service of the application and of the order, and granted the relief in the second draft order, including approval of the receiver’s activities and an amendment to its borrowing charge. No monetary award was made: although the court required refunds of post-judgment prepaid rent and the return of damage deposits, it did not quantify those amounts, so no exact figure can be determined from the decision.

CMLS Financial Ltd. in Its Capacity as Trustee of Computershare Trust Company of Canada
Law Firm / Organization
Borden Ladner Gervais LLP (BLG)
2264356 Alberta Ltd.
Law Firm / Organization
Ogilvie LLP
Lawyer(s)

Susy Trace

Grant Thornton Ltd (Receiver)
Law Firm / Organization
Miller Thomson LLP
Lawyer(s)

Spencer Norris

307086 Alberta LTD
Law Firm / Organization
Court & Stults LLP
Lawyer(s)

T. Lynn Bougie

Alberta Lawyers Indemnity Association
Law Firm / Organization
McLennan Ross LLP
Lawyer(s)

Lisa Sirman

Constructive Solutions
Law Firm / Organization
MLT Aikins LLP
Lawyer(s)

Fahim Rahman

a lienholder
Law Firm / Organization
McAllister LLP
Lawyer(s)

Morgan M. Deacon

Court of King's Bench of Alberta
2603 17850
Bankruptcy & insolvency
Not specified/Unspecified
Plaintiff